Our Projects
Our project portfolio reflects the breadth of South East Corp Group's expertise across residential, commercial, hospitality, education, healthcare and public sector developments. From large-scale new-build schemes and complex refurbishments to specialist fire protection and high-quality fit-out projects, we deliver technically demanding solutions with precision, professionalism and a commitment to excellence. Explore a selection of our completed projects, showcasing the quality, capability and collaborative approach that define every South East Corp Group delivery.
Kitchener Barracks
Situated in the heart of Chatham, the Old Barracks development is a landmark residential regeneration scheme comprising 197 modular apartments across Blocks E, F and G, together with the comprehensive refurbishment and extension of an existing reinforced concrete framed building to create a further 68 apartments.
South East Corp Group provided design coordination and construction expertise throughout. Our scope included the installation of the external brickwork and aluminium façade systems, together with comprehensive CAT A/B Fit-Out incorporating partitions, ceilings, bespoke carpentry and joinery, fire doors, and first fix, second fix and final fix works. Through close collaboration with the client, design consultants and wider project team, we ensured seamless coordination between trades, precise installation and the successful delivery of a high-quality residential development that met the project's demanding programme, technical and quality requirements.
Beulah Hill

This development comprised the construction of a seven-storey apartment building and three townhouses on a constrained hillside site on the edge of Croydon, requiring careful planning, technical coordination and phased construction to overcome the challenges associated with the site's topography and restricted access.
The scope of works included ground preparation, enabling and remedial strengthening works, installation of below-ground drainage and utility services, and the formation of a secure lower ground parking facility. Construction progressed through the superstructure and into a comprehensive internal fit-out, including the installation and coordination of fire and security systems, kitchen installations, flooring, painting and decorating, and all associated finishing works. Upon completion, a full handover documentation package was produced for each apartment, ensuring compliance with project specifications, statutory requirements and client quality standards.
Minster Close
South East Fire Protection Specialists Ltd delivered a comprehensive passive fire protection solution, including the supply and installation of third-party certified fire-stopping systems to maintain the fire integrity of compartment walls, floors and service penetrations. Our scope also included the installation of horizontal and vertical cavity barriers and the application of intumescent coatings to structural steelwork, providing the required fire resistance in accordance with the project specification and current Building Regulations.
As a
BM TRADA Q-Mark Certified Contractor, all installations were completed in accordance with manufacturer-tested systems and certified installation procedures, supported by comprehensive quality assurance, inspection records and certification.
Carolyn House

The project involved the conversion of an existing 16-storey building into a mixed-use development, comprising retail space at ground and part first floor level, with residential accommodation spanning the second to sixteenth floors.
Delivered using Building Information Modelling (BIM) from inception through to completion, the project incorporated a comprehensive digital record of fire safety information to support the Golden Thread and regulatory compliance.
South East Corp Group played a key role in the delivery of the CAT A fit-out, undertaking the installation of internal carpentry and joinery, including BM TRADA Q-Mark fire doors, internal doorsets, skirting, architraves, window boards and bespoke joinery. Working closely with the wider project team, all works were delivered in accordance with the project specification, programme requirements and the highest standards of quality, safety and regulatory compliance.
Herne Bay

This residential development comprised 51 new-build townhouses and 49 timber frame apartments in the heart of Herne Bay. South East Corp Group delivered a comprehensive CAT A/B fit-out, providing high-quality internal construction and finishing works from shell completion through to final handover.
Our scope included the installation of internal partitions, suspended ceiling systems, dry lining, BM TRADA Q-Mark fire doors, bespoke carpentry and joinery, internal doorsets, skirting, architraves, window boards, flooring, decorations and final finishes. Working in close coordination with the wider project team, all works were delivered in accordance with project specifications, programme requirements and the highest standards of quality, safety and regulatory compliance.
Forest Hill

The project comprised the construction of three traditionally built townhouses and thirteen residential apartments, with South East Corp Group providing the labour-only carpentry package. The works included the installation of engineered TGI floor joist systems, structural timber framing and traditionally cut timber roof structures in accordance with the project specification.
Our scope also encompassed second fix carpentry, including the installation of bespoke kitchens, internal joinery, doors, ironmongery and associated finishing works. All installations were completed to the highest standards of workmanship, ensuring compliance with design specifications, programme requirements and quality assurance standards.
Maiden Lane

Maiden Lane comprised a comprehensive fire safety and compliance upgrade programme across 125 occupied residential properties over a 12-month period. The project focused on the replacement of existing external doors and windows to achieve full compliance with current Building Regulations, fire safety standards and security requirements.
South East Corp Group delivered a complete end-to-end solution, including resident liaison, programme planning, design coordination, manufacture, supply and installation of high-performance external windows and BM TRADA-certified external doorsets certified to Secured by Design (SBD) and PAS 24 standards. Our responsibilities also included scheduling and logistics management, quality assurance, liaison with Building Control and the Clerk of Works, final certification and comprehensive aftercare, ensuring minimal disruption to residents while maintaining the highest standards of quality, compliance and customer service.
Mount Green

The aim of this project was to upgrade the existing doors to comply with the latest building and fire regulations.
The works completed by Southeast Group included customer liaison, planning and scheduling of works and locations, planning and coordination. Design, manufacture and installation of all TRADA certified doors and then sign off with building control and clerk of work, including aftercare.
All the properties were occupied throughout the contract period, and we had excellent client feedback from the residents of Mount Green Housing Association.
Waitrose St Ives

This project focused on enhancing fire safety at the Waitrose store in St Ives, Cambridgeshire, through the installation of fire barriers and fire curtains. These measures were implemented within the walls and ceilings to provide effective fire containment and protection. The work was carried out in strict compliance with current fire safety regulations, ensuring the safety of both the building and its occupants. This project highlights our commitment to delivering high-quality fire protection solutions tailored to meet regulatory and safety requirements.
Tesco Colchester

This project comprised the refurbishment of a live retail environment, including the installation of soffit and fascia systems, suspended ceiling systems, metal stud partitions and internal wall constructions. The works also incorporated associated dry lining and finishing elements, delivered in accordance with project specifications and current Building Regulations.
Operating within a fully occupied store, all works were carefully phased and coordinated to maintain uninterrupted trading. Robust health and safety procedures, effective programme management and close coordination with the client ensured the successful delivery of the project to the highest standards of quality, compliance and workmanship.
Tesco Slough

This project involved the refurbishment and reconfiguration of a live retail environment, incorporating the installation of suspended MF and grid ceiling systems, metal stud partitioning, dry lining, soffit and fascia systems, and fire-rated wall constructions. The works also included associated architectural finishes, service integration and detailed interface coordination to ensure compliance with the project specification and current Building Regulations.
Working within a fully operational retail environment, all activities were carefully sequenced to maintain uninterrupted trading. Through rigorous programme management, strict health and safety controls, and close coordination with the client and specialist trades, the project was delivered to the highest standards of quality, technical performance and regulatory compliance.
Tesco Hastings

This refurbishment project at
Tesco, Hastings involved the reconfiguration of the existing retail space to create a new in-store phone shop within a live trading environment. The works included the demolition of existing partition systems, formation of floor chases for new services, installation of metal stud partitions, and the supply and installation of BM TRADA Q-Mark certified fire doors. All works were delivered in accordance with project specifications and current Building Regulations, with careful phasing to minimise disruption to store operations.
Oakwood School

This project involved the supply and installation of a high-performance Rockpanel cladding system, delivering a durable, low-maintenance façade solution in accordance with the project specification and manufacturer installation requirements. The works included subframe installation, cladding panel fixing, interface detailing, cavity barriers and associated finishing elements to ensure compliance with current Building Regulations and façade performance standards.
Working within a live environment, all activities were carefully planned and coordinated to maintain programme, minimise disruption and ensure the highest standards of quality, safety and workmanship throughout the project.
Nestles Avenue

This new-build residential development at Nestle Avenue, Hayes comprises a ten-storey scheme delivering 103 high-quality residential units. South East Corp Group was responsible for the design, supply and installation of the Steel Framing System (SFS), including through-wall construction, together with the delivery of a comprehensive CAT A/B fit-out.
The fit-out works included internal partitions, dry lining, suspended ceiling systems, bespoke carpentry and joinery, BM TRADA Q-Mark fire doors, internal doorsets, architectural finishes and MEP coordination. All works were delivered in accordance with project specifications, current Building Regulations and the highest standards of quality, safety and technical compliance.
Bereavement Centre

South East Fire Protection Specialists Ltd delivered a comprehensive passive fire protection solution, including the supply and installation of third-party certified fire-stopping systems to maintain the fire resistance of compartment walls, floors and service penetrations. Our scope also included the installation of horizontal and vertical cavity barriers within façade systems and concealed voids to prevent the spread of fire and smoke.
As a
BM TRADA Q-Mark Certified Contractor, all works were completed in accordance with manufacturer-tested details, current Building Regulations and industry best practice, supported by comprehensive quality assurance and certification.